CHOP CULT HOME
Email Password
Search

Search Forums:

Type: Posts; User: jcrubin

Page 1 of 4 1 2 3 4

Search Forums: Search took 0.01 seconds.

  1. Replies
    33
    Views
    13,223

    Chapter 31 concludes the checklist starting with...

    Chapter 31 concludes the checklist starting with the installation of the inner primary. The gasket is first greased to be removable, then the bearing for the starter Bendix is greased along with the...
  2. Replies
    33
    Views
    13,223

    Chapter 30 brings the project to a final...

    Chapter 30 brings the project to a final checklist before the priming and timing. Ill start from back to front from my list, the first task is the chain alignment and tension. For this task Ill be...
  3. Replies
    33
    Views
    13,223

    Chapter 29 takes the project to installation of...

    Chapter 29 takes the project to installation of the intake manifold, the setup of the carb as well as an S&S stealth Air kit. I chose this kit so I could put on a stock harley air filter cover and...
  4. Replies
    33
    Views
    13,223

    Before getting fully underway with part 28 I'd...

    Before getting fully underway with part 28 I'd decided that the Rear brake line had to go, it was simply too dangerous. Id measured out the size and ordered a replacement line, adding along with it...
  5. Replies
    33
    Views
    13,223

    Chapter 27 continues with the setup of the...

    Chapter 27 continues with the setup of the clutch, installed in the last chapter. This is a five finger basket. Some prefer 3 some 5, both have their advantages and drawbacks. The locking tool placed...
  6. Replies
    33
    Views
    13,223

    Now in chapter 26 having completed the starter...

    Now in chapter 26 having completed the starter rebuild in the last chapter the next logical step will be starter installation. While sadly a new starter was ultimately used for the build, every...
  7. Replies
    33
    Views
    13,223

    Chapter 25 is a departure from the bike itself to...

    Chapter 25 is a departure from the bike itself to focus specifically on the starter. Its never operated correctly relegating the bike to kick only. I'd like to have a go at it, before my knee gives...
  8. Replies
    33
    Views
    13,223

    Now at Chapter 24 there are several projects...

    Now at Chapter 24 there are several projects underway as well as a main project which is the installation of the transmission. Firstly, the battery tray mount was falling off and it appeared that the...
  9. Replies
    33
    Views
    13,223

    Continuing on with chapter 23, the engine now...

    Continuing on with chapter 23, the engine now mounted and shimmed into the frame, the top end can now be assembled.Previously the heads have been redone as well as the rocker boxes so they are ready...
  10. Replies
    33
    Views
    13,223

    In part 22 we have the bike on the on the new...

    In part 22 we have the bike on the on the new lift, having assembled our engine and transmission from smaller projects. All of these are brought together as preparations are done, and the rest of the...
  11. Replies
    33
    Views
    13,223

    Continuing with Part 21 the bushings have all...

    Continuing with Part 21 the bushings have all been pressed in the the rocker arms and the must now be reamed to size. Ive leaded the rocker arms into a vice with soft jaws. The reamer in a T-bar with...
  12. Replies
    33
    Views
    13,223

    With this the twentieth episode the heads are...

    With this the twentieth episode the heads are revisited from the very beginning of the project where they were quickly re-assembled after inspection. They deserve the same attention as the rest of...
  13. Replies
    33
    Views
    13,223

    In this the 19th chapter in the series, the...

    In this the 19th chapter in the series, the casting on the pistons will be corrected along with a few measurement before we finally mount everything onto the engine. I took exception to the raised...
  14. Replies
    33
    Views
    13,223

    Continuing onward to part 18 in the series, we...

    Continuing onward to part 18 in the series, we reach the point where work will be conducted with the cylinders, pistons and rings. As such all Items will need to be measured to ensure proper fitment....
  15. Replies
    33
    Views
    13,223

    Part 17 brings us to the second video in the...

    Part 17 brings us to the second video in the engine build series which includes the gearcase Lifters cam and other associated parts. As each section of parts is re-introduced they are cleaned from...
  16. Replies
    33
    Views
    13,223

    With part 15 behind us, we move to a new chapter...

    With part 15 behind us, we move to a new chapter in this project with the reassembly of the Shovelhead engine. I have this bottom end, just rebuilt returned and on the stand for this task. This...
  17. Replies
    33
    Views
    13,223

    We continue with the sixth and final chapter of...

    We continue with the sixth and final chapter of the transmission restoration. All of the required shims have arrived and I will be combining them together based on my notes so that the fork placement...
  18. Replies
    33
    Views
    13,223

    In this episode we continue with the 5th part in...

    In this episode we continue with the 5th part in the transmission series, continuing from the counter-shaft assembly and installation. Now we move onto the shift forks. This begins with the...
  19. Replies
    33
    Views
    13,223

    This episode continues with the reassembly of the...

    This episode continues with the reassembly of the 4 speed transmission. This will deal with the counter-shaft assembly. This includes disassembly, cleaning, inspection, and reassembly. The ends of...
  20. Replies
    92
    Views
    23,838

    Part 12 has been posted to ...

    Part 12 has been posted to

    http://www.chopcult.com/forum/showthread.php?t=53163
  21. Replies
    33
    Views
    13,223

    In part 12 of this series where we will begin the...

    In part 12 of this series where we will begin the reassembly of the transmission with the arrival of the custom modified mainshaft from Ray [saddlebagrail]. The custom work and seals are evident...
  22. Replies
    92
    Views
    23,838

    You're welcome. More to come as I find time for...

    You're welcome. More to come as I find time for editing.... and building... and well work and stuff
  23. Replies
    92
    Views
    23,838

    Part 11 has been posted to ...

    Part 11 has been posted to

    http://www.chopcult.com/forum/showthread.php?t=53163
  24. Replies
    33
    Views
    13,223

    Part 11 continues the tear-down after the...

    Part 11 continues the tear-down after the disassembly from the transmission case. This will start with the disassembly with the kicker cover. The first observation is that the 40lb/ft nut is loose,...
  25. Replies
    33
    Views
    13,223

    This video starts a several part sub series that...

    This video starts a several part sub series that makes up the transmission restoration project for this motorcycle. As it was already discovered that the transmission had also suffered some degree...
Results 1 to 25 of 90
Page 1 of 4 1 2 3 4

Log in

Log in