The next stage was to make the base some 2mm ali sheet was bought and work started by folding round some trussty exhaust tube
[IMG][/IMG]
next it could be marked out and cut to shape to match teh frame tubes then drilled ready for riveting.
[IMG][/IMG]
Next the leading edge which had been left long was hammered over to give a rolled edge
[IMG][/IMG]
And final riveting into the rear hoop
[IMG]
[/IMG]
till next time thanks for watching
[IMG][/IMG]
next it could be marked out and cut to shape to match teh frame tubes then drilled ready for riveting.
[IMG][/IMG]
Next the leading edge which had been left long was hammered over to give a rolled edge
[IMG][/IMG]
And final riveting into the rear hoop
[IMG]
[/IMG]
till next time thanks for watching
Comment